Jens Hadel  +49 171 6313756            

Translate to:


HadelBlog - Alle Bereiche

Liebherr LR 1750/2 with VarioTray
Anzeige:
Jens Hadel / cranes / 13.12.2018 16:19     A+ | a-

Construction work on rail tracks which require railway traffic to be postponed for a limited time generally have one thing in common – massive time pressure. The essential thing is that the trains start moving again on schedule after the end of the planned track closure. The installation of a massive steel bridge over a rail track in Altenburger Land (Thuringia) was completed faster than scheduled – the VarioTray detachable ballast system on the LR 1750/2 crawler crane used for the job saved around 90 minutes compared to conventional suspended ballast.


Hoisting a 240-tonne arched bridge in the small village of Nobitz in the State of Thuringia, around 40 kilometres south of Leipzig, was a perfect opportunity for using this smart ballasting system for Liebherr crawler cranes. By reducing the radius during the hoist from an initial 32 metres to 18 metres, the crane had to significantly reduce the ballast on the derrick boom. Instead of removing the ballast slabs with a set-up crane, as has been the normal time-consuming procedure in the past, the majority of the suspended ballast was simply unbolted and disconnected – taking a matter of minutes. Only the centre stack of the ballast pallet weighing a total of 340 tonnes was left as ballast on the derrick boom until the load was finally lowered into position

Bridge heavier than planned – variable ballast radius tackled the challenge
The bridge was around 20 tonnes heavier than planned. Peter Drabsch, the Team Manager from crane contractor Maxikraft Kran- und Schwerlastlogistik and crane operator Ralf Ludwig tackled the situation quite calmly. They adjusted the derrick radius of the suspended ballast from 18 to 20 metres, which compensated for the additional weight without a problem. Together with the hook block, hoisting equipment and yoke, the Liebherr crawler crane had to handle a gross load of 249 tonnes for the installation of this steel bridge.

Dutch heavy haulage and transport logistics contractor Wagenborg-Nedlift was responsible for the bridge installation and had rented the crawler crane from Maxikraft. The Dutch were also responsible for transporting the arched bridge from the assembly site to the abutment on the bridge construction. A number of SPMTs were used for this purpose. Wagenborg’s Project Manager Bart van den Belt was absolutely delighted by the benefits of the VarioTray system after the bridge had been hoisted into position: “This feature is fantastic! An auxiliary crane would have taken ages to do the work.  We saved a lot of time using VarioTray.” 


pictures and text by Liebherr Ehingen
older post back to the overview newer post
Anzeige:

other interesting cranes:

www.hadel.net
Peiner ABK 42-80

Dieser Peiner ABK 42-80 ist der perfekte Baustellenkran, denn nur wenig Stellfläche genügt um die Lasten auf bis zu 50 Metern anzuheben.

Weiterlesen...
www.hadel.net
Terex AC 500-2 Export

Im Herbst 2011 wartete dieser elfenbeinfarbene Terex AC 500-2 im Bremerhavener Hafen.

Weiterlesen...
www.hadel.net
Terex-Demag AC 700 8achsige Sonderausführung

Doch dieser Kran hat eine weitere Besonderheit, die erst auf den zweiten Blick auffällt: Eine Achse weniger als die Serie! Normalerweise verfügt der Terex-Demag AC 700 in der Serienversion über 3 Achsen vor dem ersten Stützzylinder.

Weiterlesen...
www.hadel.net
Mammoet Plattform Twin-Ring Containerised 3

Im April 2005 stand bei der Firma Huisman der neue dritte PTC zu den letzten Tests bereit.

Weiterlesen...
www.hadel.net
Demag AC 665 von Enercon

Die Traglast des Demag AC 665 liegt bei 250 Tonnen und der Teleskopausleger kann auf eine Länge von maximal 57,8 Metern ausgefahren werden.

Weiterlesen...
www.hadel.net
Liebherr LTM 1300 NX Carim

Im Sommer 2006 kam dieser nagelneue Liebherr LTM 1300NX in Bremerhaven an, um per Schiff nach China ausgeliefert zu werden.

Weiterlesen...
www.hadel.net
Liebherr LTM 1350-6.1 Premiere auf der Intermat 2009

Auf der Intermat 2009 präsentierte Liebherr erstmals den neuen LTM 1350-6.1.

Weiterlesen...
www.hadel.net
Terex AC 500-2 von Wagenborg

Dieses Bild bot sich Ende Juni 2012 im Eemshavener Hafen nahe der Kraftwerksbaustelle.

Weiterlesen...